Update from February 27th Meeting with the Architect

The Committee met with Tom from Excel Engineering. Tom was presented with a drawing our committee had done on its own.  It was a quick meeting.  Tom informed us that he will take this back and come up with a drawing and some elevations for us to take a look at, and to make sure the things we "drew up" were to code and will make the appropriate corrections.  They will also give their professional opinions about any changes they might think are beneficial to us.  Tom from Excel was looking at a two-week turnaround to get us the layout and elevations back.  The committee will then meet with him to go over what Excel has come up with.  We are looking at another meeting mid-March.  As always, all Immanuel church and school members should feel free to email any questions or concerns about our school expansion ideas and needs to schoolexpansion@ilutheran.org.